Project management ch 6 | Operations Management homework help

 

 

Which of the following represents an activity on an AON project network?
  A) An arrow
  B) A line
  C) A node
  D) Both A and B are correct
  E) A, B, and C are all correct
 
 
 

Arrows on an AON project network represent:
  A) An activity
  B) Project flow
  C) Dependency
  D) Both B and C are correct
  E) Both A and B are correct
 
 
 

Which of the following is provided by a project network but not by the work breakdown structure?
  A) Dependencies
  B) Sequencing
  C) Interrelationships
  D) Both A and B are correct
  E) A, B, and C are all correct
 
 
 

Part of a project is to Develop Product Specifications. This is best classified as a(n)
  A) Event
  B) Path
  C) Activity
  D) Node
  E) Milestone
 
 
 

The critical path in a project network is the
  A) Shortest path through the network
  B) Longest path through the network
  C) Network path with the most difficult activities
  D) Network path using the most resources
  E) Network path with the most merge activities
 
 
 

An item on a project network is Design Software Completed. This is best described as a(n)
  A) Event
  B) Path
  C) Activity
  D) Node
  E) Milestone
 
 
 

A sequence of connected, dependent activities is termed a(n)
  A) Critical path
  B) Parallel path
  C) Activity chain
  D) Path
  E) Dependent chain
 
 
 

Which of the following is not one of the basic rules to follow when developing project networks?
  A) An activity cannot begin until all preceding activities have been completed
  B) Each activity must have a unique identification number
  C) Conditional statements are allowed but looping statements are not allowed
  D) An activity identification number must be larger that that of any preceding activities
  E) Networks flow from left to right
 
 
 

________ activities must be completed immediately before a particular activity.
  A) Merge
  B) Burst
  C) Predecessor
  D) Successor
  E) Critical
 
 
 
10 
The forward pass in project network calculations determines the
  A) Earliest time’s activities can begin
  B) Earliest time’s activities can be finished
  C) Duration of the project
  D) Both A and B are correct
  E) A, B, and C are all correct
 
 
 
11 
The backward pass in project network calculations determines the
  A) Latest time’s activities can begin
  B) Earliest time’s activities can be finished
  C) Critical path
  D) Both A and C are correct
  E) A, B, and C are all correct
 
 
 
12 
The amount of time an activity can be delayed and yet not delay the project is termed
  A) Total slack
  B) Free slack
  C) Critical float
  D) Float pad
  E) Slip pad
 
 
 
13 
The laying pipe example in the text illustrates the concept of
  A) Laddering
  B) Hammock activities
  C) Critical path
  D) Concurrent engineering
  E) Forward pass
 
 
 
14 
Typically an activity on a project network represents
  A) A single work package
  B) One or more tasks from a work package
  C) Several work packages
  D) A sub-deliverable
  E) A cost account
 
 
 
15 
Concurrent engineering is a good example of good use of
  A) Start to Start lags
  B) Start to Finish lags
  C) Finish to Finish lags
  D) Finish to Start lags
  E) Any of these could be correct

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more

STAY HOME, SAVE LIVES. Order your essay today and save 20% with the discount code ATOM